Art’22

Rehabilitation of a classical 1940’s building, concrete structure, exceptional solar exposure of the main facade, facing the Vatican embassy’s gardens.

Gross area:
1500 m² on 5 floors

 

1100 m² of flats: 
2bdr (106m² + terraces)
3bdr (180m² + terraces)

 

Works duration: 
24 months (April 2014 – April 2016)